This project's tight schedule was a serious challenge. We had 25 days to design and create outdoor neon signs, laser-etched interior signs, thousands of pictures printed on canvas and properly framed. We also had to print tens of square metres of transparent foil, and come up with design solutions for numeroius decorative elements on the floors and ceilings. Despite the massive amount of work, we were able to deliver on time, and without a single slip.